PT. Arkonin Manggala Pratama Engineering has vast experience in the field of Water Supply, include: Raw Water, Building Air Intake / Intake, Transmission Pipeline, Pipelines Distribution, Water Treatment Plant, Reservoir, pump, SCADA, Connections Home and other supporting buildings.

Services Expertise implemented include: Assessment, Feasibility Studies (Technical and Non-Technical), the Master Plan (Masterplan), Advisory, Real Needs Survey, Detailed Engineering Design, Supervision and Commissioning Test. Some of the major projects that have been made will be described below. 

Review Design and "Pengawasan Pemasangan Jaringan Pipa Distribusi Utama" (JDU) and "Jaringan Pipa Distribusi Bagi" (JDB), at Zone 1, Corridor 2 (benda – Batu Ceper)

 Area: Kota Tangerang
 Year: 2016-2018
 User Services: PT. Moya Indonesia
 Job description:

  • Conducting Review of Design and Supervision of the Key Distribution Network, Network Distribution Share and reticulation pipes in Zone 1 Corridor 2, Benda and Batu Ceper in Tangerang.
  • Installation supervision Main Distribution Pipeline Network HDPE diameter of 250 mm to 500 mm and 600 mm.
  • Installation Supervision Network Distribution For HDPE Pipe diameter 250 mm, 400 mm, and 500 mm.
  • Network Installation supervision reticulation HDPE pipe diameter 63 mm, 90 mm, and 110 mm.
  • Total Pipe Length about 200 km.
  • Technology / Working Methods using manual boring and Horizontal Directional Drilling (HDD).

 

 

Review Design and Control of Water Supply System at 14 Locations in the region of Central and Eastern part of Indonesia

 Area: Indonesia Central and Eastern
 Year: 2015
 User Services: PAM Directorate, Ministry DGHS PUPR
 Job description:

  1. Procurement and Installation of Pipes for Sea Water Reverse Osmosis (SWRO), Nusa Lembongan, Klungkung, Bali.
  2. Optimizing Procurement and Construction Works SPAM Low-Income Communities (MBR) SWRO Untung Jawa Island, Seribu Islands District, Jakarta Province.
  3. Procurement and Installation of Pipes for SWRO, Ende, Ende, East Nusa Tenggara (NTT).
  4. Procurement and Installation of Pipes for SWRO, Maratua, Berau regency, East Kalimantan.
  5. IKK SPAM development Tegowanu, Grobogan, Central Java Province.
  6. Optimization Works and Development SPAM IKK MBR North Arut Kotawaringin West, Central Kalimantan.
  7. Optimization Work and Development Centers SPAM IKK cascade MBR, Kotawaringin West Central Kalimantan.
  8. Optimization Works and Development SPAM IKK Establish MBR, Porcupine District, West Kalimantan.
  9. Optimization Works and Development SPAM IKK MBR Senyiur, Muara Ancalong, East Kalimantan.
  10. Optimization Works and Development SPAM IKK Tering MBR, West Kutai, East Kalimantan.
  11. Procurement and Installation of Pipes, Kupang, East Nusa Tenggara (NTT).
  12. Development Support MBR SPAM Sail Tomini, East Luwu regency, Central Sulawesi.
  13. Optimization of SPAM MBR Bungin, North Makale, Kab. Tana Toraja, South Sulawesi.
  14. Construction of SPAM IKK North Makale, Kab. Tana Toraja, South Sulawesi.

 

 

Review Design and Control of Water Supply System in South Sulawesi and Gorontalo

 Area: South Sulawesi and Gorontalo
 Year: 2014
 User Services: PAM Directorate, Ministry DGHS PUPR
 Job description:

  1. Procurement and Installation of Pipe Major Distribution Network (JDU) Supports SWRO Bunaken Island North Sulawesi province.
  2. Facilitated SPAM IKK Ayuhulalo district was Gorontalo Province
  3. Facilitated SPAM IKK Middle Suwawa Bolango Bone regency, Gorontalo Province
  4. SPAM development SWRO Tanakeke Island District. Takalar South Sulawesi province.

  

Review Design and Control of Water Supply System Capital City  District (CCI) in the Sumatra and West Java

 Location: Province of Aceh, North Sumatra, West Sumatra, Jambi, South Sumatra and West Java
 Year: 2014-2015
 User Services: PAM Directorate, Ministry DGHS PUPR
 Job description:

  • Compose design review Water Treatment Plant, Transmission Pipeline, Reservoir, Main Distribution Network, Pumps and Building Support.
  • Development Control Water Treatment Plant in 17 regencies /municipalities with capacity of 20-40 liters per second.
  • Construction supervision Raw Water Unit /intake and the Main Distribution Pipeline.

      

  

Supervision of Water Supply System in South Sulawesi and West Sulawesi

 Area: South Sulawesi and West Sulawesi
 Year: 2013
 User Services: PAM Directorate, Ministry DGHS PUPR
 Job description:

  • Supervision / Supervision SPAM Development Strategic Area in South Sulawesi and West Sulawesi as many as 47 packages of work in 32 districts and 22 District, covering: Development IPA 15 package, the procurement and installation of pipe 32 package.
  • Supervision / Supervision SPAM Development in South Sulawesi province about 18 IPA Package includes construction and installation of pipes.

  

Review Design and Construction Supervision of Water Supply System Blora

 Location: Blora (SPAM Sambong IKK, IKK Jiken, Jepon IKK, IKK Bogorejo, MBR and MBR Cepu Blora)
 Year: 2016-2017
 User Services: PAM Directorate, Ministry DGHS PUPR
 Job description:

 
      • Development supervision intake capacity 2 x 55 l / s.
      • Development Control Water Treatment Plant (IPA) Concrete capacity 2x50 l / s
      • Reservoir construction supervision capacity of 2x700 m3, 600 m3 and 750 m3.
      • HDPE Transmission Pipeline Installation supervision and Steel diameter of 400-450 mm length + 37 km.
      • Installation supervision Main Distribution Pipelines 160 mm diameter HDPE length of 6,000 m and a diameter of 110 mm length of 3,230 m.
      • Supporting Building Development Supervision

 

 