East Kalimantan Balikpapan Bay Power Plant (2 X110 MW)

 

Work Package Name:

Construction supervision and QA / QC East Kalimantan Balikpapan Bay power plant (2 X 110 MW) Balikpapan - East Kalimantan
Employer:
PT. PLN (Persero) PARENT UNIT DEVELOPMENT OF THE EASTERN KALIMANTAN

 

Job description:
East Kalimantan Balikpapan Bay power plant (2x110 MW) carried out by the EPC contractor Consortium of PT. Adhi Karya and Sino Hydro, Arkonin Engineering Supervisor KSO-Wiratman Mangala-Bina Pratama Lestari. The main fuel used is coal with a kind of low rank coal (4000Kkal / kg), with a consumption of ± 3.8544 million tons per year..
Implementation of the years 2010 - 2018 (Amendment 18)

Scope of activities:

Civil Works
Site Preparation; Turbine Foundation & Structure; Boilers & Auxiliary Foundation; Cooling Water intake and Discharge Structure; Balance of Plant / BOP Foundation & Structure; Coal Storage & Facilities; Ash Disposal Area & Facilities; Coal Unloading Jetty; Administration Building; Miscellaneous Building; Site Finishing (Road, Drains, Fence, Etc.)

Mechanical Work
Boiler and Auxiliary Equipment; Steam Turbine and Auxiliary; Condenser and Feed Water Heating Plant; Plant Water System (Including Condensate Polishing Water System); Drainage and Waste Water Treatment Plant; Fire Protection System; Compressed Air System; Chemical Feed System; Sampling Rack System; Laboratory and Instrument; Chlorination System; Air Conditioning and Ventilation; Crane and Hoist; Workshop and Machinery Equipment; Mobile Equipment; Coal Handling; Ash Handling System; Coal Unloading Jetty Equipment

Electrical Work
Power Station; Substation; Switch Yard; T / L 150 kV Power Station - Switch Yard; Control and Instrumentation

Others
training; Mandatory Spare Part; Maintenance Tools and Testing Equipment; Consumable; Manufacture Inspection and Expediting Design Review

 

 

 

 Manufacture Details Transports Road Design, Bridge, Coal Processing Facility and Pier

Implementation began on February 9, 2018.
Employers: PT. Multi Tambangjaya Main (Member of Indika Energy Group)


Job description:
PT. Multi Tambangjaya Main (QUALITY) intends to increase the handling capacity of coal that exist today to 3.5 million tons per year, to support this facility improvements haul road (hauling road), jetty, stock pile, port and processing facilities of coal (coal handling facilities-CHF) should also be improved.
PT. Arkonin Engineering Manggala Pratama carry out the work of making detailed design haul roads, bridges and coal processing facility (CHF) for the improvement of the supporting facilities and the achievement of production with a capacity of 3.5 million tons per year.

Project location:
Coal mining site of PT. Multi Top Tambangjaya located in Buntok, South Barito district, Central Kalimantan
Scope of Services:

  1. Preparation of Design Details Transports Road, Bridge & Pier
  • a. Data Collection (Survey Topography, Soil Investigation, Bathymetry, Drone)
  • b. Preparation of Detail Design
    • • Transport road
    • • Drainage
    • • Bridge
    • • Dock
  1. Preparation of Design Details Coal Processing Facility (CHF)
  • Survey Assessment (Assessment) Coal Processing Facility (CHF) Existing
  • Preparation of Development Plans of Coal Processing Facility (CHF)

 

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer