You are here

PLTA ASAHAN 3 (2x 77 MW)

Scope of Services:

  1. Asahan 3 Hydroelectric Power Plant Project Install 154 MW capacity (2 x 77 MW); (This work is a Design Review includes soil investigation, topographical and hydrological survey) - 2006
  2. Engineering Services for Asahan No. 3 Hydroelectric Power Plant Construction Project - 2010

Employer: PT. PLN (Persero)

Project location:
North Meranti village, District Pitupohan Meranti, Tobasa District - North Sumatra Province

Job description:
Building a hydroelectric plant run-of-river (capacity: 154 MW) and the related transmission lines in the province of North Sumatra.

View PLTA Asahan 3 ( 2 x 77 )

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer