SUPERVISI KONTRUKSI & QA/QC PROYEK PLTU 3 BANGKA (2 X 30 MW)

Employer::
PT. PLN (Persero) Unit Induk Pembangunan I

Scope of Services:
Civil Work

  • Site Preparation; Turbine Foundation & Structure; Boiler & Auxiliary Foundation; Cooling Water intake & Discharge Structure; Balance of Plant/BOP Foundation & Structure; Coal Storage & Facilities; Ash Disposal Area & Facilities; Coal Unloading Jetty; Administration Building; Miscellaneous Building; Site Finishing (Road, Drains, Fence, Etc)

 

Mechanical Work

  • Boiler and Auxiliary Equipment; Steam Turbine and Auxiliary; Condenser and Feed Water Heating Plant; Plant Water System 
  • (Including Condensate Polishing Water System); Drainage and Waste Water Treatment Plant; Fire Protection System; Compressed Air System; Chemical Feed System; Sampling Rack System; Laboratory and Instrument; Chlorination System; Air Conditioning and Ventilation; Crane and Hoist; Workshop and Machinery Equipment; Mobile Equipment; Coal Handling; Ash Handling System; Coal Unloading Jetty Equipment

Electrical Work

  • Power Station; Substation; Switch Yard; T/L 150 kV  Power Station – Switch Yard; Control and Instrumentation

Others 

  • Training; Mandatory Spare Part; Maintenance Tool and Testing Equipment; Consumable; Manufacture Inspection and Design Review Expediting