2009-2016 (82 months), Location: Denpasar, Sanur and Kuta, Bali, User Services: Directorate PPLP, DGHS Ministry PUPR
Review Design and Construction Supervision of Wastewater Pipelines, Pump House and Wastewater Treatment Plant (WWTP) Denpasar Sewerage Development Project II (DSDP II)
Project description:
- Do design review against WWTP, pumping station and pipeline gatherers;
- Supervising the construction of the WWTP, wastewater pipe network ф 200-1200 mm with a total length of 130 km, the pump housing and house connections;
- Do review SOUP.