2009-2016 (82 months), Location: Denpasar, Sanur and Kuta, Bali, User Services: Directorate PPLP, DGHS Ministry PUPR

Review Design and Construction Supervision of Wastewater Pipelines, Pump House and Wastewater Treatment Plant (WWTP) Denpasar Sewerage Development Project II (DSDP II)

Project description:

  1. Do design review against WWTP, pumping station and pipeline gatherers;
  2. Supervising the construction of the WWTP, wastewater pipe network ф 200-1200 mm with a total length of 130 km, the pump housing and house connections;
  3. Do review SOUP.