2017, Area: 29 districts / municipalities in 16 provinces in Indonesia, East Region, User Services: Directorate PPLP, DGHS PUPR

 

Infrastructure Development Technical Assistance East Region Waste Management

Project description:

  1. To coordinate with provincial PSPLP PIU, PIU (SKPD) related and supervisory consultant.
  2. Facilitating the supervising consultant to overcome the technical problems so that the implementation of the Waste landfill development work in accordance with the rules and technical rules applicable.
  3. Creating a field monitoring and reporting format for kab./kota assistants and experts.
  4. Doing workshop in order to equip the assistant city / county by experts before the assistant kab./kota placed on the ground.
  5. Make checklist and verification as well as regular monitoring of the landfill development package which has not been / are being / have been tendered in FY 2017.
  6. Studying the Detailed Engineering Plan document (RTR) landfill waste and identify potential problems during the development of the planning document.
  7. To monitor the progress of the construction of landfill waste in accordance with an S-curve.
  8. Conducting the monitoring, reporting and provide technical recommendations for the implementation of development around the landfill waste Fiscal Year 2017.
  9. Provide input on development guidelines landfill waste by monitoring in the field.
  10. Collecting data on landfill waste-related infrastructure awakened, whether established before 2017 and were awakened in FY 2017.
  11. To collect data related to the dimensions of landfill waste infrastructure were awakened in FY 2017.
  12. Doing workshop in order confirmation and clarification of the evaluation results of development increase in landfill waste as well as providing and delivering technical recommendations.
  13. Provide input on development guidelines landfill waste by monitoring in the field.