2017, Area: 29 districts / municipalities in 16 provinces in Indonesia, East Region, User Services: Directorate PPLP, DGHS PUPR
Infrastructure Development Technical Assistance East Region Waste Management
Project description:
- To coordinate with provincial PSPLP PIU, PIU (SKPD) related and supervisory consultant.
- Facilitating the supervising consultant to overcome the technical problems so that the implementation of the Waste landfill development work in accordance with the rules and technical rules applicable.
- Creating a field monitoring and reporting format for kab./kota assistants and experts.
- Doing workshop in order to equip the assistant city / county by experts before the assistant kab./kota placed on the ground.
- Make checklist and verification as well as regular monitoring of the landfill development package which has not been / are being / have been tendered in FY 2017.
- Studying the Detailed Engineering Plan document (RTR) landfill waste and identify potential problems during the development of the planning document.
- To monitor the progress of the construction of landfill waste in accordance with an S-curve.
- Conducting the monitoring, reporting and provide technical recommendations for the implementation of development around the landfill waste Fiscal Year 2017.
- Provide input on development guidelines landfill waste by monitoring in the field.
- Collecting data on landfill waste-related infrastructure awakened, whether established before 2017 and were awakened in FY 2017.
- To collect data related to the dimensions of landfill waste infrastructure were awakened in FY 2017.
- Doing workshop in order confirmation and clarification of the evaluation results of development increase in landfill waste as well as providing and delivering technical recommendations.
- Provide input on development guidelines landfill waste by monitoring in the field.