2015, Location: East Karawang, West Java, User Services: PT. Surya Cipta Swadaya

Planning Building Detail Waste Water Treatment Plant (WWTP) Organica Suryacipta City Industry.

Job description:

Planning structures pre-treatment (control room, office space, laboratory space), building food chain reactor (FCR), building clarifier, supporting building lighting building pre-treatment, PJU, the lightning rod, street and drainage along the 150 m and networks he main pipe of 700 mm, 150 m long and WWTP building capacity of 5,000 m3 / day

Technology / methods / software: SAP