2012, Location: Cikarang district. Bekasi, West Java, User Services: PT. Puradelta Lestari

 

Planning Cipamingkis River Bridge 1 Delta Mas

Project description:

Planning Cipamingkis River Bridge 1 using this type of kontruksiI girder with spans of 80 m (20 +40 +20) Width 2 x 10.5 m, there are two pillars of each pillar 10 m high and 2 buildings abutment.

Technology / methods / software: SAP