2010-2018, Location: Balikpapan – East Kalimantan, User Services: PLN (Persero) Parent Unit Development of the Eastern Kalimantan.
East Kalimantan Balikpapan Bay Power Plant (2 X110 MW)
Job description:
East Kalimantan Balikpapan Bay power plant (2×110 MW) carried out by the EPC contractor Consortium of PT. Adhi Karya and Sino Hydro, Arkonin Engineering Supervisor KSO-Wiratman Mangala-Bina Pratama Lestari. The main fuel used is coal with a kind of low rank coal (4000Kkal / kg), with a consumption of ± 3.8544 million tons per year..
Implementation of the years 2010 – 2018 (Amendment 18)
Scope of activities:
Civil Works
Site Preparation; Turbine Foundation & Structure; Boilers & Auxiliary Foundation; Cooling Water intake and Discharge Structure; Balance of Plant / BOP Foundation & Structure; Coal Storage & Facilities; Ash Disposal Area & Facilities; Coal Unloading Jetty; Administration Building; Miscellaneous Building; Site Finishing (Road, Drains, Fence, Etc.)
Mechanical Work:
Boiler and Auxiliary Equipment; Steam Turbine and Auxiliary; Condenser and Feed Water Heating Plant; Plant Water System (Including Condensate Polishing Water System); Drainage and Waste Water Treatment Plant; Fire Protection System; Compressed Air System; Chemical Feed System; Sampling Rack System; Laboratory and Instrument; Chlorination System; Air Conditioning and Ventilation; Crane and Hoist; Workshop and Machinery Equipment; Mobile Equipment; Coal Handling; Ash Handling System; Coal Unloading Jetty Equipment
Electrical Work:
Power Station; Substation; Switch Yard; T / L 150 kV Power Station – Switch Yard; Control and Instrumentation
Others:
training; Mandatory Spare Part; Maintenance Tools and Testing Equipment; Consumable; Manufacture Inspection and Expediting Design Review