Location: PLTU 3 Bangka, User Services: PLN (Persero)

 

 

 

Construction Supervision and QA / QC 3 Bangka Power Plant Project (2 X 30 MW)

 

Scope of Services:
Civil Works
Site Preparation; Turbine Foundation & Structure; Boilers & Auxiliary Foundation; Cooling Water intake and Discharge Structure; Balance of Plant / BOP Foundation & Structure; Coal Storage & Facilities; Ash Disposal Area & Facilities; Coal Unloading Jetty; Administration Building; Miscellaneous Building; Site Finishing (Road, Drains, Fence, Etc.)

Mechanical Works
Boiler and Auxiliary Equipment; Steam Turbine and Auxiliary; Condenser and Feed Water Heating Plant; Plant Water System (Including Condensate Polishing Water System); Drainage and Waste Water Treatment Plant; Fire Protection System; Compressed Air System; Chemical Feed System; Sampling Rack System; Laboratory and Instrument; Chlorination System; Air Conditioning and Ventilation; Crane and Hoist; Workshop and Machinery Equipment; Mobile Equipment; Coal Handling; Ash Handling System; Coal Unloading Jetty Equipment

Electrical Works
Power Station; Substation; Switch Yard; T / L 150 kV Power Station – Switch Yard; Control and Instrumentation

Others (Miscellaneous Works)
Training; Mandatory Spare Part; Maintenance Tools and Testing Equipment; Consumable; Manufacture Inspection and Expediting Design Review