2016-2017, Location: Blora (SPAM Sambong IKK, IKK Jiken, Jepon IKK, IKK Bogorejo, MBR and MBR Cepu Blora), User Services: PAM Directorate, Ministry DGHS PUPR
Review Design and Construction Supervision of Water Supply System Blora
Project description:
- Development supervision intake capacity 2 x 55 l / s.
- Development Control Water Treatment Plant (IPA) Concrete capacity 2×50 l / s
- Reservoir construction supervision capacity of 2×700 m3, 600 m3 and 750 m3.
- HDPE Transmission Pipeline Installation supervision and Steel diameter of 400-450 mm length + 37 km. Installation supervision Main Distribution Pipelines 160 mm diameter HDPE length of 6,000 m and a diameter of 110 mm length of 3,230 m.
- Supporting Building Development Supervision.