December 2017- October 2019 (22 months), Area: City of Denpasar – Bali, User Services: Environmental Health Systems Development Project Implementing Unit Provincial Settlement Bali
Integrated Design (Design and Build) for Regional Landfill Revitalization Activity Sarbagita Suwung
Project description:
- Job Preparation: Clearing land and alignment Area Building Support, (2) Research Soil and Soil Test, (3) Survey Topography, (4) Operation Management System Health and Safety at Work, (5) Environmental Monitoring (6) Preparation of Profile Books, animation and documentation for work.
- Work Planning (Compilation Basic Design and Detailed Engineering Design)
- Closing & Structuring jobs Existing landfill (± 22.4 Ha)
- Landfill Sanitary Landfill Construction Work (± 5 Ha)
- Land Area Maturation job PLTSa (± 5 Ha)
- Optimization of Leachate Treatment Plant (IPL) Existing
- Supporting Infrastructure Works
- IPL Work Package