Assalammualaikum, Welcome to Arkonin Engineering Manggala Pratama   Click to listen highlighted text! Assalammualaikum, Welcome to Arkonin Engineering Manggala Pratama

2018, Location: Buntok, South Barito district, Central Kalimantan, User Services: Multi Tambang Jaya Utama (Member of Indika Energy Group),

Manufacture Details Transports Road Design, Bridge, Coal Processing Facility and Pier

Job description:
PT. Multi Tambangjaya Main (QUALITY) intends to increase the handling capacity of coal that exist today to 3.5 million tons per year, to support this facility improvements haul road (hauling road), jetty, stock pile, port and processing facilities of coal (coal handling facilities-CHF) should also be improved.
PT. Arkonin Engineering Manggala Pratama carry out the work of making detailed design haul roads, bridges and coal processing facility (CHF) for the improvement of the supporting facilities and the achievement of production with a capacity of 3.5 million tons per year.

Project location:
Coal mining site of PT. Multi Top Tambangjaya located in Buntok, South Barito district, Central Kalimantan
Scope of Services:

  1. Preparation of Design Details Transports Road, Bridge & Pier
    a. Data Collection (Survey Topography, Soil Investigation, Bathymetry, Drone)
    b. Preparation of Detail Design
    • Transport road
    • Drainage
    • Bridge
    • Dock
  2. Preparation of Design Details Coal Processing Facility (CHF)
    • Survey Assessment (Assessment) Coal Processing Facility (CHF) Existing
    • Preparation of Development Plans of Coal Processing Facility (CHF)
Click to listen highlighted text!