2006-2010, Location: North Meranti village, District Pitupohan Meranti, Tobasa District – North Sumatra Province, User Services: PT. PLN (Persero),
Asahan Hydropower 3 (2 X 77MW)

Scope of Services:
- Asahan 3 Hydroelectric Power Plant Project Install 154 MW capacity (2 x 77 MW); (This work is a Design Review includes soil investigation, topographical and hydrological survey) – 2006
- Engineering Services for Asahan No. 3 Hydroelectric Power Plant Construction Project – 2010
Job description:
Building a hydroelectric plant run-of-river (capacity: 154 MW) and the related transmission lines in the province of North Sumatra.